🚇 Bostancı–Dudullu (M8) Metro Line

The M8 Bostancı–Dudullu Metro Line is a fully underground transit corridor on Istanbul’s Asian side, stretching 14 km with 13 stations from Bostancı to Parseller. In addition to tunnels and stations, the project includes several key auxiliary structures such as:
• A Depot and Maintenance Facility located in Dudullu
• The Operations Control Center
• Underground parking areas at Kozyatağı and Bostancı
These facilities play a critical role in ensuring safe and efficient metro operations.

Duration: 2016-2019
Our Design Scope As part of this strategic infrastructure project, our team was responsible for the full MEP (Mechanical, Electrical, and Plumbing) design.
All designs were developed in compliance with international metro standards, using BIM-based coordination with other disciplines throughout the design phase.

Customer Feedback

“Throughout the project, IBS demonstrated excellent interdisciplinary coordination. They delivered comprehensive preliminary and implementation designs and managed project approvals through regular meetings with administrative authorities on our behalf.


The solutions developed by IBS complied with both local and international standards and were successfully applied during the construction phase.


We were particularly impressed by the experience and dedication of IBS’s young engineering team in both design and construction processes.


Although our company was not previously familiar with BIM systems, IBS supported us extensively during the adaptation process and cooperated effectively with the administrative control organization.”


– Gökhan Özgür, Electromechanical Works Chief